[jira] [Updated] (SLING-7027) Progress ETA seems to be calculated incorrectly and not to be updated on update.

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|  
Report Content as Inappropriate

[jira] [Updated] (SLING-7027) Progress ETA seems to be calculated incorrectly and not to be updated on update.

JIRA jira@apache.org

     [ https://issues.apache.org/jira/browse/SLING-7027?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Karl Pauls updated SLING-7027:
------------------------------
    Fix Version/s:     (was: Event 4.3.0)
                   Event 4.2.6

> Progress ETA seems to be calculated incorrectly and not to be updated on update.
> --------------------------------------------------------------------------------
>
>                 Key: SLING-7027
>                 URL: https://issues.apache.org/jira/browse/SLING-7027
>             Project: Sling
>          Issue Type: Bug
>          Components: Event
>    Affects Versions: Event 4.2.4
>            Reporter: Karl Pauls
>            Assignee: Karl Pauls
>            Priority: Minor
>             Fix For: Event 4.2.6
>
>         Attachments: eta.patch
>
>
> It looks to me like the eta is not correctly calculated in JobImpl.setProgress and not set correctly in JobImp.update.
> I would like to apply the attached patch to fix it. Does that look correct to others?



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)
Loading...